Information on the hydroelectric situation and management of Cascade
Calendar Announcement 13/03/2017

he situation created by the heavy snow and the significant lowering of temperatures is being followed also by the Albanian Power Corporation (KESH).
The hydropower plants of Fierze, Koman and Vau Dejes are being maintained under control while the daily production of electricity at the Cascade of Drin reached 16 064 000 kWh. The energetic reserve of the country actually is 776 GWh.