Bechtel and Kesh present the results of the study phase of the project
Following the feasibility study, this part of the first phase for the development of the HEC Skavica project, a joint meeting was held between the company Bechtel, KESH sh.a., as well as the international partners involved in this phase of project. The main object of this meeting was the presentation by Bechtel of the results of the study work developed so far. The main focus of the presentation was the discussion on the proposed options regarding the determination of the dam axis, a process carried out on the basis of the analysis of technical-economic criteria.